OPTIMASI PRODUKSI PADA PENAMBANGAN BATUBARA DENGAN METODE ANTRIAN (STUDI KASUS PADA PERTAMBANGAN AREA SAMARINDA, KALTIM).

Alloysius Vendhi, Prasmoro (2016) OPTIMASI PRODUKSI PADA PENAMBANGAN BATUBARA DENGAN METODE ANTRIAN (STUDI KASUS PADA PERTAMBANGAN AREA SAMARINDA, KALTIM). Jurnal Sains & Teknologi Fakultas Teknik, VI (1). ISSN 2088-060X

[img]
Preview
Text
OPTIMASI PRODUKSI PADA PENAMBANGAN BATUBARA....pdf

Download (595kB) | Preview
Official URL: http://repository.unsada.ac.id/cgl/oai2

Abstract

Coal mining business is now faced with various challenges such as export restrictions policy, an increase in value added products, and the decline in market prices of products. To be able to compete, mining companies are expected to increase productivity and efficiency and make continuous improvements in the production process. The purpose of this study was to optimize the production of coal mining in the context of the efficient use of equipment using queueing methode. The research location is in the area of the mining concession contractor in October-November 2015. Production equipment used backhoe excavator is 5 units and 32 units of dump trucks. The simulation results the queuing method generated by the method optimal dump truck needs 25 units. The results of production optimization with queueing method produced mining productivity of 1,208 BCM of overburden per hour with the optimum cost of $ 0909 / BCM.

Item Type: Article
Uncontrolled Keywords: production optimize, waiting time, queuing, production cost, cycle time
Subjects: 600 Technology and Applied Sciences /Teknologi dan Ilmu-ilmu Terapan > 658.5 Management of Production/Manajemen Produksi
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Setyo Renny Perpustakaan
Date Deposited: 17 Aug 2020 04:41
Last Modified: 17 Aug 2020 04:41
URI: http://repository.unsada.ac.id/id/eprint/1317

Actions (login required)

View Item View Item