Muswar, Muslim and Ayom, Buwono and Danny, Faturachman (2017) APPLICATION OF ORGANIC RANKINE CYCLE POWER PLANT ON COASTER 1000 DWT. In: SENTA ITS 2017, 7th December 2017, ITS Surabaya, Indonesia. (Submitted)
|
Text
APPLICATION_OF_ORGANIC_RANKINE_CYCLE_POWER_PLANT_O.pdf Download (1MB) | Preview |
Abstract
The need for electricity is very important for the operation of a ship, especially when the ship is sailing. Inside the ship many auxiliary machines, navigation equipment and lighting are in need of electricity on its operation. The electrical components must be in a running condition. In this research, is aimed to design a model of power plant that may reduce the electrical load generated by the ship generator with concentration only on the electrical load of lighting. As the basic theory for this research is Rankine cycle, with the system is Organic Rankine Cycle (ORC). For the ship data is a 1000 DWT coaster ship with a ship length of 64 meters, width of 12 meters, and 14 knots speed vessel. The required electrical power supply is about 2740 watts.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | 600 Technology and Applied Sciences /Teknologi dan Ilmu-ilmu Terapan > 620 Engineering/Ilmu Teknik 600 Technology and Applied Sciences /Teknologi dan Ilmu-ilmu Terapan > 621.8 Machine Engineering, Machinery/Teknik Mesin 600 Technology and Applied Sciences /Teknologi dan Ilmu-ilmu Terapan > 623.8 Nautical Engineering and Seamanship/Teknik Perkapalan, Teknik Nautika dan Ilmu Angkatan laut |
Divisions: | Fakultas Teknologi Kelautan > Teknik Sistem Perkapalan |
Depositing User: | Danny Faturachman FTK |
Date Deposited: | 10 Sep 2018 03:21 |
Last Modified: | 10 Sep 2018 03:21 |
URI: | http://repository.unsada.ac.id/id/eprint/345 |
Actions (login required)
View Item |