Items where Subject is "600 Technology and Applied Sciences /Teknologi dan Ilmu-ilmu Terapan > 620.004 6 Engineering Maintenance and Repair/Perawatan dan Pemeliharaan Teknik, Perbaikan dan Reparasi Teknik"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | B | F | I | L | N | R
Number of items at this level: 14.

A

Andi, Laksono (2023) ANALISIS EFEKTIVITAS MESIN MIXING CONCRETE MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT. KAWASAN BERIKAT NUSANTARA SBU PRIMA BETON. Other thesis, UNSADA.

B

Bangun, Gultom (1996) MENENTUKAN JADWAL PERAWATAN PENCEGAHAN KERUSAKAN MESIN REAKTOR DIVISI POLYMER DISPERSION PLANT PT. BASF INDONESIA - JAKARTA. Other thesis, UNSADA.

Budi, Santoso (2001) Analisis Perbaikan Perawatan Dengan Menggunakan Model Perawatan Preventive Untuk Meminimasi Ongkos Perawatan Mesin Batching Plant Di PT. X. Other thesis, Universitas Darma Persada.

F

Firman, Cahyadi (2001) PENENTUAN INTERVAL PERAWATAN BERDASARKAN AVAILABILITAS TINGGI DAN BIAYA MINIMUM PADA GEARBOX TURBIN DI PT. X PENENTUAN INTERVAL PERAWATAN BERDASARKAN AVAILABILIT S TINGGI DAN BIAYA MINIMUM PADA GEARBOX TURBIN DI PT. X. Other thesis, Universitas Darma Persada.

I

Iip Ahmad, Syarip (2023) PERANCANGAN ALAT BANTU PADA PENGGANTIAN DISPAD FORTUNER MENGGUNAKAN METODE REBA GUNA MEMINIMALKAN TINGKAT KELUHAN MEKANIK DI AUTO2000 KELAPA GADING. Other thesis, UNSADA.

L

lrfan, Hariyanto (2013) ANALISIS PENINGKATAN RELIABILITY DAN PERBAIKAN PENJADWALAN PERAWATAN MESIN MILLING DENGAN METODE PREVENTIVE MAINTENANCE DI CV. X. Other thesis, UNSADA.

N

Nurul Azizah, Fitriani (2023) USULAN PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PEMELIHARAAN MESIN POMPA DISTRIBUSI OLI DI PT PERTAMINA LUBRICANTS. Other thesis, Unsada.

Nurul Azizah, Fitriani (2023) USULAN PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PEMELIHARAAN MESIN POMPA DISTRIBUSI OLI DI PT PERTAMINA LUBRICANTS. Other thesis, UNSADA.

R

Rafael, Alfrian N (2023) ANALISIS PEMELIHARAAN MESIN INJEKSI MOLDING MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE UNTUK MENURUNKAN TINGKAT KERUSAKAN MESIN DI PT SPITZE SENTOSA INDONESIA. Other thesis, UNSADA.

Rakka Dwi, Putra (2023) USULAN PENERAPAN LEAN SIX SIGMA PADA PRODUK HUB WHEEL 6200 FRONT DI PT BRAJA MUKTI CAKRA. Other thesis, UNSADA.

Ratih, Justitia (2002) USULAN PENERAPAN MANAJEMEN MQP (MACHINE, QUALITY AND PEOPLE) PADA SISTEM PEMELIHARAAN MESIN DI PT. "X. Other thesis, Universitas Darma Persada.

Riszki, Anugrah (2020) ANALISIS SISTEM PERAWATAN MESIN ARC SPRAY DENGAN METODE SIX BIG LOSSES UNTUK MENINGKATKAN EFEKTIVITAS MESIN DI PT.THERMIC COATING INDUSTRIES. Other thesis, UNSADA.

Rohili, Rohili (2003) PENENTUAN WAKTU PENGGANTIAN KOMPONEN PADA MESIN FILLER UNTUK MEMINIMUMKAN DOWN TIME BERDASARKAN INTERVAL WAKTU PENGGANTIAN DI PT. INDOMILK. Other thesis, Universitas Darma Persada.

Roy, Roy (2008) ANALISIS PEMELIHARAAN MESIN MELALUI PENDEKATAN PREVENTIF MAINTENANCE UNTUK MEMINIMUMKAN BIAYA PEMELIHARAAN PADA MESIN DIE CASTING DI PT. X. Other thesis, UNSADA.

This list was generated on Mon May 6 21:12:48 2024 WIB.