Items where Subject is "600 Technology, Applied Sciences/Teknologi, Ilmu Terapan > 658.404 Project Management/ manajemen proyek"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | D | F | I
Number of items at this level: 5.

A

Atik, Kurnianto (2016) PENENTUAN WAKTU PELAKSANAAN PROYEK BTS TYPE 42 TRI DENGAN METODE CPM. Jurnal Sains & Teknologi Fakultas Teknik, VI (2). pp. 85-94. ISSN 2088-060X

Atik, Kurnianto (2017) STUDY PENGUKURAN WAKTU BAKU PENGGUNAAN DOLLEY CONVEYOR UNTUK MENINGKATKAN PRODUKTIVITAS PEKERJA. Jurnal Sains & Teknologi Fakultas Teknik, VII (1). ISSN 2088-060X

D

Derry, Wanta (2018) Mekanisme Pendanaan Digester Pada Program Biogas Rumah Tangga Pertama Di Indonesia Dengan Sistem Berbayar (Studi Kasus). Jurnal Ilmiah " Media Akuntansi", XXVII (89). ISSN 0854-2449

F

Fresty Senti, Siahaan and lham Rahkman, Riefda (2018) WAKTU OPTIMAL PADA PROYEK INSTALASI BUILDING AUTOMATION SYSTEM, MONITORING TEMPERATUR DAN KONTROL DAMPER DENGAN CRITICAL PATH METHOD DI PT. TMMIN. Jurnal Sains & Teknologi Fakultas Teknik, viii (1). pp. 74-80. ISSN 2088-060X

I

Indah Eko, Wati (2015) PENGEMBANGAN APLIKASI MANAJEMEN PROYEK PERANGKAT LUNAK BERDASARKAN METODE AGILE (Studi kasus : Untuk Kebutuhan Unit TIK Universitas Darma Persada). Other thesis, Universitas Darma Persada.

This list was generated on Sat Oct 24 04:31:08 2020 WIB.